Heading to Jingchu to Build Tunnels and Ensure Safety | Integrated Drilling, Grouting, and Anchoring Rig Fully Assembled and Delivered to Hubei Project

Recently, Sichuan DrillGod Intelligent Machinery Manufacturing Co., Ltd. reached a key delivery milestone: the integrated drilling, grouting, and anchoring rig completed full assembly, performance testing, factory inspection, and protective packaging, and was successfully loaded onto a truck for shipment to the tunnel construction site in Hubei, where it will be put into service for initial tunnel support work.
The integrated drilling, grouting, and anchoring rig delivered this time combines drilling, hole flushing, automatic rod feeding, and grouting and anchoring functions into a single unit. It is suitable for the construction of system anchor bolts and foot-locking anchor bolts in Class IV and V fractured surrounding rock in highway, railway, and water conservancy tunnels, and can also meet the requirements for advance anchor bolt support operations. The equipment optimizes traditional support construction methods, eliminating the need for operators to work at close range in hazardous areas at the tunnel face, thereby reducing the safety risk of rock mass collapse at its source. Relying on an integrated continuous operation mode, parameters such as drilling depth and grout volume are controllable, effectively addressing issues such as low efficiency in traditional manual scaffolding construction and significant fluctuations in anchor installation quality. This provides strong support for the project to achieve safety, quality improvement, and efficiency gains.
From component assembly, hydraulic system debugging, drill arm motion testing, and grouting line calibration to no-load integrated testing of the entire machine, DrillGod’s quality inspection team strictly followed factory standards to verify each item. They repeatedly inspected critical systems, safety devices, and the anchor rod feeding mechanism in the anchor rod magazine to ensure that the equipment could be quickly commissioned and put into service upon arrival at the project site.
The successful delivery of this order represents the customer’s full recognition of DrillGod’s tunnel mechanized support equipment performance, delivery capabilities, and technical service system. Against the backdrop of the transition toward mechanized and intelligent tunnel construction, DrillGod will continue to focus on addressing the challenges of fractured rock construction, deepen its commitment to the R&D and manufacturing of intelligent tunnel equipment, and continuously optimize product series such as drilling, grouting, and anchoring rigs, as well as rock-drilling rigs. By leveraging stable and reliable equipment and professional on-site technical services, DrillGod will provide integrated support solutions for domestic tunnels, mines, and water conservancy projects, empowering high-quality development in engineering construction.